Figure 1 from Smart Elevator Control System for Power and Maintenance Circuit Diagram The document outlines a student project to design a smart elevator control system using a SCADA system and PLC. The project aims to 1) design and implement an elevator controlled by a S7200 PLC using ladder logic, 2) allow the elevator to move forward and backward and open and close doors, and 3) add an HMI screen for monitoring. Traditional relay-based elevator controls have limitations, so Smart Elevator Manager is a project of embedded system design that implements a smart elevator system using Raspberry Pi and Arduino for face recognition and fingerprint authorization with real-time monitoring through a mobile device, utilizing modules such as a fingerprint sensor, keypad, buzzer, distance sensor, and a web progressive app.

From a business perspective, an elevator access control system means reducing security costs, increasing comfort for office occupants and employees, and eliminating accidental or unauthorized visits. The security aspect includes protection against intrusion into restricted areas, monitoring of critical floors (for example, with server rooms

PDF A Simulation Study of an Elevator Control System using Digital Logic Circuit Diagram
A short-range wireless communication protocol used in smartphones and other mobile devices. It connects smartphones and tablets to the IoT elevator system for remote monitoring and control. RS-485 . This wired communication protocol is commonly used in industrial control systems. It can connect various sensors and controllers in an IoT elevator

The smart elevator system uses AI for face recognition and retrieves user information from the IoT-enabled cloud in real time. The ML algorithm reviews historical data to define the destination floor of the user. It is a sensor in smart sensors to control overheating. The motor current monitoring sensor (or the amp clamp) is mounted on the

Smart Elevator Management Based on IoT Solutions Circuit Diagram
This plc based smart elevator control system project consists of three sensors, on each floor these three sensors senses the load in elevator. On pressing the start button twice, the elevator moves till the second floor. And the press stop button is used to stop the elevator. As the elevator passes through the respective floors, the colour of
